How to Apply for Solar Subsidy
We handle the entire process — from application to subsidy disbursement. Here's how it works.
You Don't Need to Worry About Paperwork
From portal registration to document upload to DISCOM coordination to subsidy follow-up — we manage everything on your behalf. Your only job is to provide basic documents and enjoy free solar power.
Step-by-Step Process
Here's exactly what happens from first contact to subsidy in your account.
Contact Us
Reach out via call, WhatsApp, or the contact form. We discuss your requirements, answer questions, and schedule a site visit.
You do
Call or fill the form
We do
Understand your needs, answer questions
Site Survey & System Design
Our team visits your property, inspects the roof, checks shading and orientation, and designs the optimal solar system for your home.
You do
Allow access to your roof
We do
Complete site survey, share system design and quote
PM Surya Ghar Registration
We register your application on the PM Surya Ghar portal (pmsuryaghar.gov.in) and submit all required documents.
You do
Provide Aadhaar, electricity bill, bank details
We do
Portal registration, document upload, application submission
Installation
Professional installation of structure, panels, inverter, safety equipment, wiring, and all electrical connections. Typically completed in 1-2 days.
You do
Be available on installation day
We do
Full end-to-end installation
Net Metering & Inspection
We coordinate with BSES for net meter installation, grid synchronization, and DISCOM inspection. BSES provides a free bi-directional meter.
You do
Nothing — we handle it
We do
BSES coordination, meter installation, inspection
Subsidy Disbursement
We upload the commissioning report on the PM Surya Ghar portal. Subsidy is transferred directly to your bank account via DBT within 30-45 days.
You do
Receive subsidy in your bank account
We do
Commissioning report upload, follow-up until disbursement
Typical Timeline
| Phase | Duration |
|---|---|
| Consultation + Site Survey | 1-3 days |
| Portal Registration + Approvals | 3-7 days |
| Installation | 1-2 days |
| Net Metering + DISCOM Inspection | 7-15 days |
| Subsidy Disbursement | 30-45 days |
Timelines are approximate and may vary based on DISCOM scheduling and portal processing times.